{"id":6884,"date":"2026-08-04T07:12:39","date_gmt":"2026-08-04T07:12:39","guid":{"rendered":"https:\/\/pickandplacemachine.com\/?p=6884"},"modified":"2026-08-04T07:12:41","modified_gmt":"2026-08-04T07:12:41","slug":"turnkey-smt-project-timeline-from-purchase-order-to-volume-production","status":"publish","type":"post","link":"https:\/\/pickandplacemachine.com\/fr\/turnkey-smt-project-timeline-from-purchase-order-to-volume-production\/","title":{"rendered":"Turnkey SMT Project Timeline from Purchase Order to Volume Production"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A complete SMT assembly line might look simple on a business quotation&#8211; printer, SPI, pick-and-place equipments, reflow stove, AOI, conveyors, loaders, unloaders&#8211; however the real project includes loads of technical reliances that have to converge prior to one commercial PCBA leaves the line.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Why do so many purchasers still deal with the equipment delivery date as the manufacturing beginning date?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Since it makes the resources demand less complicated to accept. It likewise produces a timeline that is generally fictional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">My working criteria for a conventional imported SMT line is&nbsp;<strong>14 to 20 weeks from purchase order to regulated volume production<\/strong>. An extremely standardized line with a skilled factory team may move quicker. A complex automotive, medical, aerospace, high-mix, dual-lane, nitrogen-reflow, traceability-heavy, or multi-line installment can take&nbsp;<strong>20 to 30 weeks<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That estimate is not a guarantee. It is a preparation variety based on sequential engineering entrances.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The difficult fact is this: the SMT machines are usually prepared before the consumer is.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-1.jpg\" alt=\"Turnkey SMT Project Timeline from Purchase Order to Volume Production\" class=\"wp-image-6889\" srcset=\"https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-1.jpg 960w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-1-300x225.jpg 300w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-1-768x576.jpg 768w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-1-16x12.jpg 16w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-1-500x375.jpg 500w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 id=\"what-a-reasonable-complete-smt-job-timeline-looks-like\" class=\"wp-block-heading\">What a Reasonable Complete SMT Job Timeline Looks Like<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A legitimate SMT job timeline has at least seven entrances:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Business and technical order release<\/li>\n\n\n\n<li>Product and process-data freeze<\/li>\n\n\n\n<li>Line engineering and equipment preparation<\/li>\n\n\n\n<li>Essais d'acceptation en usine<\/li>\n\n\n\n<li>Delivery, custom-mades, and site preparedness<\/li>\n\n\n\n<li>Complete SMT line installment and appointing<\/li>\n\n\n\n<li>NPI validation and production ramp-up<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">These phases overlap, however they can not be carelessly compressed. Shipping can run while the manufacturing facility sets up power and compressed air. Operator training can start prior to every product dish is complete. Pattern layout may proceed while machines are being configured.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However acceptance screening can not show a procedure that has actually no authorized PCB, BOM, centroid data, pattern requirements, feeder plan, solder paste, or element collection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No data, no ramp.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The wider production field has learned this lesson expensively. Deloitte reported that production-material preparations had actually improved from a July 2022 peak of 100 days to 87 days in August 2023, yet continued to be over pre-pandemic standards. The very same study found that 76% of surveyed makers were embracing electronic supply-chain devices, while 86% of making executives anticipated smart-factory services to drive competitiveness over the following 5 years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Getting automatic devices is not the same thing as developing a clever factory. Integration decides the result.<\/p>\n\n\n\n<h2 id=\"week-0-to-week-2-order-launch-and-engineering-freeze\" class=\"wp-block-heading\">Week 0 to Week 2: Order Launch and Engineering Freeze<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The job begins when the order ends up being practically executable, not when the buying department e-mails a PDF.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That distinction matters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A distributor can not finish line balancing, feeder appropriation, nozzle option, conveyor-width confirmation, cycle-time simulation, or acceptance-test preparation without functional production data. At minimum, I would certainly anticipate the customer to release:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Gerber and ODB++ files<\/li>\n\n\n\n<li>Accepted BOM with supplier part numbers<\/li>\n\n\n\n<li>Centroid or XY placement data<\/li>\n\n\n\n<li>PCB dimensions and panel arrangement<\/li>\n\n\n\n<li>Board thickness and edge-clearance information<\/li>\n\n\n\n<li>Minimum part size and maximum element elevation<\/li>\n\n\n\n<li>Bottom-side element restrictions<\/li>\n\n\n\n<li>Approximated placements per board<\/li>\n\n\n\n<li>Required CPH or boards-per-hour target<\/li>\n\n\n\n<li>Solder paste and alloy requirements<\/li>\n\n\n\n<li>Evaluation and traceability requirements<\/li>\n\n\n\n<li>Manufacturing facility voltage, regularity, atmospheric pressure, and exhaust information<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For a 350 \u00d7 250 mm panel bring 1,200 positionings, including 0201 passives, 0.4 mm-pitch BGAs, shield containers, connectors, and odd-form components, the equipment arrangement can not be copied from a common 40,000 CPH sales brochure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nominal CPH is marketing data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Real outcome depends upon element distribution, feeder placements, nozzle changes, head traveling, board transfer time, fiducial recognition, assessment load, replenishment losses, and line balance. A maker rated at 50,000 CPH might deliver much less on a feeder-heavy, high-mix setting up.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The purchase-order stage should end with a signed technological spec covering:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Tools models and quantities<\/li>\n\n\n\n<li>Board-size variety<\/li>\n\n\n\n<li>Element ability<\/li>\n\n\n\n<li>Target cycle time<\/li>\n\n\n\n<li>Changeover presumptions<\/li>\n\n\n\n<li>Utilitaires<\/li>\n\n\n\n<li>Communications procedure<\/li>\n\n\n\n<li>MES demands<\/li>\n\n\n\n<li>Traceability depth<\/li>\n\n\n\n<li>FAT requirements<\/li>\n\n\n\n<li>Installation extent<\/li>\n\n\n\n<li>Training scope<\/li>\n\n\n\n<li>Warranty start point<\/li>\n\n\n\n<li>Last acceptance conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Anything vague currently ends up being a disagreement later on.<\/p>\n\n\n\n<h2 id=\"week-1-to-week-6-smt-production-line-configuration-and-in-depth-design\" class=\"wp-block-heading\">Week 1 to Week 6: SMT Production Line Configuration and In-depth Design<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This is where the provider turns a listing of makers into one manufacturing system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work generally includes line-layout style, conveyor-interface checks, equipment configuration, feeder and nozzle planning, software application preparation, electric compatibility testimonial, barcode-flow layout, and process-routing verification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A fundamental line might consist of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Automatic PCB loader<\/li>\n\n\n\n<li>Solder paste printer<\/li>\n\n\n\n<li>3D SPI<\/li>\n\n\n\n<li>High-speed chip second<\/li>\n\n\n\n<li>Adaptable pick-and-place machine<\/li>\n\n\n\n<li>Eight- or ten-zone reflow oven<\/li>\n\n\n\n<li>AOI 3D<\/li>\n\n\n\n<li>Reject conveyor<\/li>\n\n\n\n<li>Publication unloader<\/li>\n\n\n\n<li>Barcode or laser-marking station<\/li>\n\n\n\n<li>MES interface<\/li>\n\n\n\n<li>Nitrogen generator or systematized nitrogen link<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Much more tools is not instantly far better. I have actually seen task requirements where purchasers included SPI, AOI, X-ray, laser marking, conformal finish, depaneling, and full traceability without defining who would have the data or respond to alarms.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That creates a pricey caution system. Not a controlled process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Throughout this duration, the vendor must complete an initial cycle-time evaluation making use of the client&#8217;s real placement data. The line should be balanced around the slowest restraint, which may be the flexible mounter, reflow house time, AOI inspection program, hands-on odd-form insertion, or downstream test operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The fastest device does not set outcome.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The bottleneck does.<\/p>\n\n\n\n<h2 id=\"week-3-to-week-8-tools-preparation-combination-and-manufacturing-facility-acceptance-screening\" class=\"wp-block-heading\">Week 3 to Week 8: Tools Preparation, Combination, and Manufacturing Facility Acceptance Screening<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Manufacturing facility approval testing, or FAT, is the initial serious proof that the purchased system exists as defined.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It must not be a ritualistic video call.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A beneficial FAT checks machine condition, identification numbers, options, software application licenses, security circuits, conveyor transfer, board-width modification, barcode reading, dish loading, feeder acknowledgment, nozzle schedule, positioning repeatability, alarm handling, and line interaction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where consumer materials are available, the distributor ought to run a representative board or examination panel. Where they are not, the FAT should plainly divide equipment approval from procedure approval.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Those are various events.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a lead-free SAC305 process, the FAT might demonstrate transfer and devices capability, yet the last reflow recipe still depends upon board mass, copper circulation, component thermal sensitivity, paste distributor support, stove loading, conveyor rate, and the determined thermal profile. SAC305&#8217;s liquidus point is around 217 \u00b0 C, yet that does not mean every setting up needs to make use of the very same optimal temperature or time-above-liquidus window.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Process engineering can not be replicated and pasted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The FAT report should record:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>FAT Thing<\/th><th>Proof Required<\/th><th>Usual Failure<\/th><\/tr><\/thead><tbody><tr><td>Devices identification<\/td><td>Version, serial number, option list<\/td><td>Quoted option missing out on<\/td><\/tr><tr><td>Board transfer<\/td><td>Repeated automatic transfers<\/td><td>Conveyor handoff jams<\/td><\/tr><tr><td>Positioning procedure<\/td><td>Demonstration run and mistake log<\/td><td>Feeder or nozzle mismatch<\/td><\/tr><tr><td>Examination assimilation<\/td><td>SPI\/AOI recipe and outcome circulation<\/td><td>No closed-loop data path<\/td><\/tr><tr><td>Barcode traceability<\/td><td>Checked serial linked to recipe<\/td><td>Replicate or unreadable codes<\/td><\/tr><tr><td>Security systems<\/td><td>Interlock and emergency-stop test<\/td><td>One device quits, line proceeds<\/td><\/tr><tr><td>Documentation<\/td><td>Guidebooks, wiring representations, back-ups<\/td><td>Data provided after shipment<\/td><\/tr><tr><td>Spare-parts package<\/td><td>Validated packing list<\/td><td>Consumables omitted<\/td><\/tr><tr><td>Educating readiness<\/td><td>Schedule and responsible fitness instructor<\/td><td>Educating lowered to button procedure<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The FAT needs to likewise determine installment consumables, approved lubricants, cleaning up products, calibration devices, extra belts, filters, nozzles, sensing units, and feeder-maintenance components.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This seems minor. It is not.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A device can endure global products and still shed appointing days because one oil cartridge, positioning jig, software application dongle, transformer, exhaust fitting, or barcode permit was not loaded.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-4.jpg\" alt=\"Turnkey SMT Project Timeline from Purchase Order to Volume Production\" class=\"wp-image-6888\" srcset=\"https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-4.jpg 960w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-4-300x225.jpg 300w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-4-768x576.jpg 768w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-4-16x12.jpg 16w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-4-500x375.jpg 500w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 id=\"week-6-to-week-12-shipping-customs-and-manufacturing-facility-readiness\" class=\"wp-block-heading\">Week 6 to Week 12: Shipping, Customs, and Manufacturing Facility Readiness<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Shipping shows up. Site prep work is not.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is why supervisors enjoy vessel-tracking internet sites while disregarding the electrical specialist that has actually not mounted the proper power decreases.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For international turnkey SMT line installation, transit might involve export packing, inland transport, port handling, sea or air cargo, custom-mades clearance, location transport, discharging, and equipment positioning. The customer should have the HS codes, business invoice, packaging listing, certification demands, importer information, and tax treatment assessed prior to the devices leave the distributor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, the factory has to prepare:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Flooring loading and levelness<\/li>\n\n\n\n<li>Equipment footprints and solution clearances<\/li>\n\n\n\n<li>Stable electric supply<\/li>\n\n\n\n<li>Grounding and ESD security<\/li>\n\n\n\n<li>Dry compressed air<\/li>\n\n\n\n<li>Exhaust air ducts<\/li>\n\n\n\n<li>Nitrogen supply, where required<\/li>\n\n\n\n<li>Temperature level and humidity control<\/li>\n\n\n\n<li>Network goes down and IP addresses<\/li>\n\n\n\n<li>MES server accessibility<\/li>\n\n\n\n<li>Material-storage areas<\/li>\n\n\n\n<li>Solder-paste refrigeration<\/li>\n\n\n\n<li>Stencil-cleaning centers<\/li>\n\n\n\n<li>Inbound evaluation space<\/li>\n\n\n\n<li>Safe rigging and unloading gain access to<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This is where the timetable is frequently shed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A line getting here 3 days late is troublesome. A line getting to a manufacturing facility without transformer, no air dryer, no exhaust, no network gain access to, and an entrance narrower than the reflow stove is a monitoring failing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Samsung&#8217;s 2024 choice to postpone distributions of ASML devices for its Texas center supplies a larger-scale version of the very same caution: tools timing need to follow a validated production and customer plan, not a separated construction or purchase schedule. Reuters reported that the business had delayed distributions while the center had actually not yet safeguarded major clients for the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Spend and preparedness are not basic synonyms.<\/p>\n\n\n\n<h2 id=\"week-10-to-week-14-turnkey-smt-line-setup-and-appointing\" class=\"wp-block-heading\">Week 10 to Week 14: Turnkey SMT Line Setup and Appointing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Installment makes the equipment functional. Commissioning shows that the integrated line acts as one system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The distinction issues because a row of powered equipments is not a commissioned line.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Setup usually covers discharging, placing, progressing, electrical link, compressed-air connection, exhaust link, conveyor placement, network connection, start-up, software checks, and fundamental function screening.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Commissioning goes even more:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Conveyor handshake recognition<\/li>\n\n\n\n<li>PCB transfer and width-change testing<\/li>\n\n\n\n<li>Dish interaction<\/li>\n\n\n\n<li>Barcode and serialization flow<\/li>\n\n\n\n<li>Printer-to-SPI feedback<\/li>\n\n\n\n<li>Placement-data confirmation<\/li>\n\n\n\n<li>Reflow profiling<\/li>\n\n\n\n<li>AOI program production<\/li>\n\n\n\n<li>Reject-routing recognition<\/li>\n\n\n\n<li>Alarm-recovery examinations<\/li>\n\n\n\n<li>Back-up and reconstruction procedures<\/li>\n\n\n\n<li>Preventive-maintenance arrangement<\/li>\n\n\n\n<li>Operator and professional training<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Keep the upkeep discussion machine-specific. Do not assume that a person NLGI Quality 2 lubricating substance can replace every OEM-specified item simply since the consistency looks comparable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Direct overviews, round screws, feeder systems, equipments, bearings, chains, and high-load sliding surface areas might call for various base oils, thickeners, additives, and solution intervals. A commissioning extra kit might consequently consist of an OEM-approved&nbsp;<a href=\"https:\/\/pickandplacemachine.com\/fr\/mpo1-7-grease-supplier-reliable-industrial-lubrication\/\">MPO( 1 )-7 industrial equipment oil<\/a>&nbsp;for designated mechanisms, a&nbsp;<a href=\"https:\/\/pickandplacemachine.com\/fr\/molykote-br2-plus-manufacturer-high-performance-grease\/\">Molykote BR2 Plus oil for crammed bearings and equipments<\/a>&nbsp;where the maintenance handbook permits a MoS \u2082-having lube, or an&nbsp;<a href=\"https:\/\/pickandplacemachine.com\/fr\/oks-422-grease-dealer-durable-high-performance-lubricant\/\">OKS 422 multi-purpose mechanical oil<\/a>&nbsp;for authorized basic service factors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Do not improvisate right here.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mixing inappropriate thickeners or using solid-lubricant grease to a device that needs a clean, low-residue item can reduce component life rather than prolong it. The maker supplier&#8217;s lubrication chart takes concern over a supplier&#8217;s general item description.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The appointing exit gate need to be documented. &#8220;The machines run&#8221; is also weak.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I would certainly call for a signed list confirming that every device runs safely, every interface interacts, every supplied choice is made it possible for, back-up data exist, training has actually taken place, and outstanding defects have actually named proprietors and closure dates.<\/p>\n\n\n\n<h2 id=\"week-12-to-week-17-smt-npi-process-and-item-certification\" class=\"wp-block-heading\">Week 12 to Week 17: SMT NPI Process and Item Certification<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The SMT NPI procedure is the bridge between devices capability and item capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is where several job teams come to be impatient. The makers are mounted. Senior monitoring wants output. Sales has currently promised a delivery day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So the group misses controlled knowing and jumps to production quantities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Misstep.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">NPI ought to begin with data recognition and a restricted develop. The procedure engineer validates the BOM, element bundles, polarity, feeder configuration, nozzle selection, pattern, assistance tooling, printer parameters, SPI restrictions, positioning collaborates, reflow account, AOI collection, repair work criteria, and traceability document.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A reasonable development might resemble this:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>First article:<\/strong>\u00a01 to 5 boards for mechanical and programming verification<\/li>\n\n\n\n<li><strong>Design whole lot:<\/strong>\u00a010 to 30 boards for process adjusting<\/li>\n\n\n\n<li><strong>Pilot great deal:<\/strong>\u00a050 to 200 boards for repeatability and issue analysis<\/li>\n\n\n\n<li><strong>Pre-production whole lot:<\/strong>\u00a0Amount based upon customer credentials demands<\/li>\n\n\n\n<li><strong>Regulated volume:<\/strong>\u00a0Restricted release with improved inspection<\/li>\n\n\n\n<li><strong>Typical quantity:<\/strong>\u00a0Criterion tasting and manufacturing controls<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The amounts are not global. An affordable consumer controller and a Course 3 aerospace assembly ought to not share the same credentials strategy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At this phase, teams should track more than pass or fall short. Beneficial dimensions include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rendement au premier passage<\/li>\n\n\n\n<li>Rolled throughput return<\/li>\n\n\n\n<li>Flaws per million chances<\/li>\n\n\n\n<li>Solder-paste volume circulation<\/li>\n\n\n\n<li>Positioning error price<\/li>\n\n\n\n<li>AOI false-call price<\/li>\n\n\n\n<li>Reflow-profile stability<\/li>\n\n\n\n<li>Transition time<\/li>\n\n\n\n<li>Feeder-related deductions<\/li>\n\n\n\n<li>Mean time to fix<\/li>\n\n\n\n<li>Boards per hour<\/li>\n\n\n\n<li>Scrap and remodel price<\/li>\n\n\n\n<li>Traceability completeness<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A maker can accomplish positioning precision while the line still produces bad yield because the pattern aperture, board assistance, paste problem, thermal account, component storage space, or evaluation restrictions are wrong.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Condemning the pick-and-place machine is very easy. Process possession is harder.<\/p>\n\n\n\n<h2 id=\"week-15-to-week-20-smt-manufacturing-ramp-up-to-stable-quantity\" class=\"wp-block-heading\">Week 15 to Week 20: SMT Manufacturing Ramp-Up to Stable Quantity<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Volume production is not the first day the line reaches the target per hour price.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is the point at which the factory can consistently meet outcome, yield, high quality, traceability, staffing, and changeover needs without continuous treatment from the vendor&#8217;s elderly designer.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is a greater bar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During ramp-up, output commonly adheres to an unequal contour:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Initial construct rate is intentionally low<\/li>\n\n\n\n<li>Programming and feeder errors are gotten rid of<\/li>\n\n\n\n<li>SPI limits are adjusted<\/li>\n\n\n\n<li>Reflow setups are supported<\/li>\n\n\n\n<li>AOI false calls are reduced<\/li>\n\n\n\n<li>Operators gain self-confidence<\/li>\n\n\n\n<li>Material discussion improves<\/li>\n\n\n\n<li>Maintenance routines become regular<\/li>\n\n\n\n<li>Shift-to-shift variant ends up being visible<\/li>\n\n\n\n<li>Actual traffic jams change thought bottlenecks<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This is typical.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What is not typical is stating volume readiness after one thoroughly supervised demonstration batch.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A secure ramp needs to prove performance throughout numerous changes, various operators, depictive part replenishment, typical changeovers, and actual material variant. The line should recoup properly from feeder mistakes, empty reels, barcode failings, PCB jams, examination rejects, and scheduled upkeep.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Labor force readiness is entitled to more attention than it receives. IPC reported in 2024 that the electronics manufacturing services market was predicted to expand from regarding $534 billion in 2023 to $856 billion by 2030, while united state production can deal with greater than two million unfilled placements by 2031.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A fast device staffed by unprepared drivers is an expensive source of intermittent defects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TSMC&#8217;s abroad development offers a beneficial contrast. Reuters reported in 2023 that manufacturing at the firm&#8217;s very first Arizona facility was postponed to 2025 as a result of a shortage of professional employees, while sector sources described Japan&#8217;s established chip-manufacturing abilities base as an advantage for smoother expansion and ramp-up.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The range is different. The lesson is identical.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Equipment does not train itself.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-3.jpg\" alt=\"Turnkey SMT Project Timeline from Purchase Order to Volume Production\" class=\"wp-image-6887\" srcset=\"https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-3.jpg 960w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-3-300x225.jpg 300w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-3-768x576.jpg 768w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-3-16x12.jpg 16w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-3-500x375.jpg 500w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 id=\"the-complete-smt-job-timeline-at-a-look\" class=\"wp-block-heading\">The Complete SMT Job Timeline at a Look<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The following table is a useful criteria for one standard turnkey SMT production line. It assumes timely client decisions, available equipment, regular worldwide delivery, a prepared factory, and no major product redesign.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Task Stage<\/th><th>Indicative Timing<\/th><th>Key Proprietor<\/th><th>Leave Entrance<\/th><\/tr><\/thead><tbody><tr><td>Order and technological release<\/td><td>Week 0&#8211; 1<\/td><td>Customer and provider<\/td><td>Business and technical scope authorized<\/td><\/tr><tr><td>Product-data freeze<\/td><td>Week 0&#8211; 2<\/td><td>Consumer engineering<\/td><td>BOM, Gerber, XY, PCB and process information released<\/td><\/tr><tr><td>Line design and balancing<\/td><td>Week 1&#8211; 4<\/td><td>Distributor design<\/td><td>Format, device configuration and cycle model accepted<\/td><\/tr><tr><td>Equipment preparation<\/td><td>Week 2&#8211; 7<\/td><td>Vendor manufacturing<\/td><td>Equipments configured and integration-ready<\/td><\/tr><tr><td>FAT prep work and execution<\/td><td>Week 5&#8211; 8<\/td><td>Joint task team<\/td><td>FAT record signed with strike list<\/td><\/tr><tr><td>Export packing and delivery<\/td><td>Week 7&#8211; 12<\/td><td>Provider and logistics group<\/td><td>Devices supplied to client website<\/td><\/tr><tr><td>Website preparation<\/td><td>Week 4&#8211; 11<\/td><td>Customer facilities<\/td><td>Power, air, exhaust, network and floor all set<\/td><\/tr><tr><td>Setup<\/td><td>Week 11&#8211; 13<\/td><td>Supplier service team<\/td><td>Devices positioned, connected and powered<\/td><\/tr><tr><td>Line appointing<\/td><td>Week 12&#8211; 15<\/td><td>Provider and procedure engineering<\/td><td>User interfaces, dishes and safety and security functions confirmed<\/td><\/tr><tr><td>NPI and pilot builds<\/td><td>Week 14&#8211; 17<\/td><td>Consumer process team<\/td><td>Return and procedure specifications accepted<\/td><\/tr><tr><td>Regulated production ramp-up<\/td><td>Week 16&#8211; 20<\/td><td>Consumer procedures<\/td><td>Output, return and traceability secure<\/td><\/tr><tr><td>Regular volume manufacturing<\/td><td>Week 18 onward<\/td><td>Factory operations<\/td><td>Sustained performance without continuous outside support<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A neighborhood tools job may compress shipping. A custom line may extend design. A delayed facility can destroy the entire sequence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The timeline must be taken care of by entrances, not really hope.<\/p>\n\n\n\n<h2 id=\"the-approval-metrics-that-issue\" class=\"wp-block-heading\">The Approval Metrics That Issue<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The best complete SMT line remedy is not the most inexpensive plan or the system with the highest magazine CPH.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is the system whose acceptance requirements match the consumer&#8217;s actual items.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I advise separating acceptance into four levels.<\/p>\n\n\n\n<h3 id=\"device-acceptance\" class=\"wp-block-heading\">Device Acceptance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This verifies that each device meets its gotten specification, alternatives, safety functions, and basic efficiency needs.<\/p>\n\n\n\n<h3 id=\"line-approval\" class=\"wp-block-heading\">Line Approval<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This verifies transfer, interaction, barcode flow, dish control, upstream and downstream handshakes, and mistake healing.<\/p>\n\n\n\n<h3 id=\"refine-approval\" class=\"wp-block-heading\">Refine Approval<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This confirms that the chosen product can be put together within accepted solder-paste, positioning, thermal, assessment, and handiwork limits.<\/p>\n\n\n\n<h3 id=\"manufacturing-acceptance\" class=\"wp-block-heading\">Manufacturing Acceptance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This verifies sustained outcome, first-pass yield, traceability, staffing, replenishment, changeover, and maintenance under sensible operating problems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Do not incorporate all four right into a single sentence analysis &#8220;Line accepted after effective test.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That wording safeguards the seller from uncertainty. It does not shield the buyer from frustration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For upkeep acceptance, call for an approved lubrication matrix rather than a random box of grease. Where the device paperwork specifies a molybdenum-disulfide product for packed systems, an option such as&nbsp;<a href=\"https:\/\/pickandplacemachine.com\/fr\/original-mmg-200-mo-grease-manufacturer-industrial-lubricant\/\">MMG-200 MO durable MoS two grease<\/a>&nbsp;may belong in the solution supply&#8211; but only after compatibility and OEM authorization are verified.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A $20 lube decision can damage a five-figure setting up.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Check out that two times.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-2.jpg\" alt=\"Turnkey SMT Project Timeline from Purchase Order to Volume Production\" class=\"wp-image-6886\" srcset=\"https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-2.jpg 960w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-2-300x225.jpg 300w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-2-768x576.jpg 768w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-2-16x12.jpg 16w, https:\/\/pickandplacemachine.com\/wp-content\/uploads\/2026\/08\/Turnkey-SMT-Project-Timeline-from-Purchase-Order-to-Volume-Production-2-500x375.jpg 500w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<h2 id=\"why-turnkey-smt-projects-miss-their-planned-start-date\" class=\"wp-block-heading\">Why Turnkey SMT Projects Miss Their Planned Start Date<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most hold-ups are predictable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They are just disregarded up until they become expensive.<\/p>\n\n\n\n<h3 id=\"late-product-data\" class=\"wp-block-heading\">Late Product Data<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The distributor obtains the PO however waits three weeks for usable Gerbers, XY data, board illustrations, and part info.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The schedule relocations. Design does not.<\/p>\n\n\n\n<h3 id=\"uncontrolled-requirements-modifications\" class=\"wp-block-heading\">Uncontrolled Requirements Modifications<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The customer includes a laser marker, nitrogen system, second AOI, MES user interface, bigger board demand, or brand-new element bundle after equipment preparation has started.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Little sentence. Huge hold-up.<\/p>\n\n\n\n<h3 id=\"unrealistic-result-cases\" class=\"wp-block-heading\">Unrealistic Result Cases<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The quotation makes use of academic equipment CPH as opposed to substitute item cycle time. The shortage appears throughout NPI, when commercial take advantage of is weakest.<\/p>\n\n\n\n<h3 id=\"insufficient-fat\" class=\"wp-block-heading\">Insufficient FAT<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The equipments ship with open software application, documents, choice, or user interface problems. International installment engineers after that spend paid website days solving factory problems.<\/p>\n\n\n\n<h3 id=\"poor-website-preparedness\" class=\"wp-block-heading\">Poor Website Preparedness<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Power, air, exhaust, network, floor space, dumping devices, or production materials are missing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The makers wait quietly. The project spending plan does not.<\/p>\n\n\n\n<h3 id=\"weak-operator-training\" class=\"wp-block-heading\">Weak Operator Training<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Training concentrates on beginning and quiting devices, not feeder upkeep, recipe control, flaw reaction, changeover discipline, backup healing, or acceleration.<\/p>\n\n\n\n<h3 id=\"no-defined-ramp-criteria\" class=\"wp-block-heading\">No Defined Ramp Criteria<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Monitoring states success after the initial acceptable batch. Yield later on breaks down when the distributor&#8217;s designer leaves and the second shift takes over.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is why I favor a readiness review weekly from purchase order with regulated quantity. Each evaluation must show the timetable, open technological decisions, information standing, facility condition, shipping condition, FAT strike list, NPI materials, staffing, risks, and called owners.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No proprietor means no task.<\/p>\n\n\n\n<h2 id=\"often-asked-concerns\" class=\"wp-block-heading\">Often Asked Concerns<\/h2>\n\n\n\n<h3 id=\"how-long-does-it-take-to-set-up-an-smt-production-line\" class=\"wp-block-heading\">How long does it take to set up an SMT production line?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A basic complete SMT production line typically moves from purchase order to regulated quantity manufacturing in&nbsp;<strong>14 to 20 weeks<\/strong>&nbsp;when the website is prepared, tools is offered, product data is frozen, personalizeds clearance is regular, and experienced staff are ready; facility automation, neighborhood certification, cleanroom job, or design changes can prolong the project past 24 weeks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Physical setup itself may need only numerous days. Commissioning, programming, thermal profiling, evaluation setup, training, pilot manufacturing, and procedure stablizing usually need considerably much longer.<\/p>\n\n\n\n<h3 id=\"what-is-included-in-complete-smt-line-setup\" class=\"wp-block-heading\">What is included in complete SMT line setup?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Turnkey SMT line setup is the coordinated shipment, positioning, connection, arrangement, combination, screening, and handover of the total setting up system, typically consisting of the printer, SPI, placement devices, reflow oven, AOI, PCB dealing with tools, software application user interfaces, driver training, paperwork, and agreed production-support tasks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The specific scope has to be composed into the agreement. Utilities, rigging, customs clearance, MES advancement, consumables, stencils, regional permits, product shows, and manufacturing products are not immediately consisted of.<\/p>\n\n\n\n<h3 id=\"what-is-smt-line-commissioning\" class=\"wp-block-heading\">What is SMT line commissioning?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">SMT line appointing is the structured confirmation that every machine and user interface operates safely and properly as an integrated production system, including PCB transfer, recipe control, barcode traceability, positioning operation, reflow profiling, examination data, alarm system healing, software program back-up, maintenance arrangement, and driver response.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Appointing is not total merely since every machine powers on. The line has to refine boards, communicate across user interfaces, manage faults, preserve production information, and meet the agreed acceptance list.<\/p>\n\n\n\n<h3 id=\"when-does-smt-volume-manufacturing-formally-start\" class=\"wp-block-heading\">When does SMT volume manufacturing formally start?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">SMT quantity manufacturing starts when the line can continuously fulfill accepted result, return, quality, traceability, staffing, maintenance, and shipment requirements under typical manufacturing facility conditions, rather than during a solitary supplier-supervised demonstration run or a restricted engineering construct making use of particularly chosen materials.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The launch choice need to be supported by pilot-lot information, secure process specifications, educated drivers, controlled flaw rates, material readiness, approved job guidelines, and a recorded action prepare for recurring failures.<\/p>\n\n\n\n<h3 id=\"what-triggers-the-biggest-hold-up-in-an-smt-project-timeline\" class=\"wp-block-heading\">What triggers the biggest hold-up in an SMT project timeline?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The largest SMT project hold-ups generally come from incomplete product data, late specification modifications, an unprepared manufacturing facility, slow client authorizations, missing out on manufacturing materials, personalizeds troubles, weak FAT coverage, and insufficient procedure or driver training&#8211; not from the physical act of putting the devices on the production floor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The practical protection is an incorporated project routine with measurable exit gateways, regular threat reviews, icy responsibilities, and acceleration days established before the order is launched.<\/p>\n\n\n\n<h3 id=\"just-how-should-a-buyer-choose-the-very-best-turnkey-smt-line-remedy\" class=\"wp-block-heading\">Just how should a buyer choose the very best turnkey SMT line remedy?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The very best turnkey SMT line service is the configuration that accomplishes the needed item mix, real cycle time, placement capability, inspection insurance coverage, traceability, transition efficiency, maintainability, local assistance, and total ownership cost utilizing the consumer&#8217;s actual PCB and part data&#8211; not the highest theoretical CPH published in a pamphlet.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prior to purchase, request line balancing against representative products, a total choice list, clear FAT and SAT treatments, named service obligations, software program extent, upkeep requirements, spare-parts prices, training deliverables, and measurable production-acceptance criteria.<\/p>\n\n\n\n<h2 id=\"build-the-timeline-before-acquiring-the-machines\" class=\"wp-block-heading\">Build the Timeline Before Acquiring the Machines<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A complete SMT project should begin with evidence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Send the PCB measurements, panel drawing, Gerber or ODB++ package, BOM, centroid file, element count, minimal bundle, optimum element height, target CPH, soldering requirements, examination needs, factory energies, destination, and needed volume-production date.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Then request for three records prior to authorizing the arrangement:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A product-based cycle-time quote<\/li>\n\n\n\n<li>A gate-based execution schedule<\/li>\n\n\n\n<li>A composed acceptance plan covering FAT, setup, appointing, NPI, and manufacturing ramp-up<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">That is how a purchase order becomes a production line.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Not by optimism. By control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>A sensible SMT job timeline is developed around design entrances, not a provider&#8217;s hopeful distribution date. This overview maps the course from purchase order to secure outcome, consisting of FAT, delivery, site preparation, appointing, NPI, and producing ramp-up.<\/p>","protected":false},"author":1,"featured_media":6889,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[839],"tags":[1843,1847,1845,1844,1846,1842],"class_list":["post-6884","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-turnkey-automation","tag-complete-smt-assembly-line","tag-quantity-manufacturing-ramp-up","tag-smt-appointing","tag-smt-line-installment","tag-smt-npi-refine","tag-smt-task-timeline"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"_links":{"self":[{"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/posts\/6884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/comments?post=6884"}],"version-history":[{"count":1,"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/posts\/6884\/revisions"}],"predecessor-version":[{"id":6894,"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/posts\/6884\/revisions\/6894"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/media\/6889"}],"wp:attachment":[{"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/media?parent=6884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/categories?post=6884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pickandplacemachine.com\/fr\/wp-json\/wp\/v2\/tags?post=6884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}